
1.435MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
16Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
38.4dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Polcom Sp. z o.o.Operator
About this facility
Polcom Alwernia Datacenter is a 1.435 MW (est.) data center in Grojec, Poland operated by Polcom Sp. z o.o., currently operational. Estimated water use is about 16,377 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 1.435 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 16,377 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Polcom Alwernia Datacenter?
- Polcom Alwernia Datacenter is a 1.435 MW (est.) data center in Grojec, Poland operated by Polcom Sp. z o.o., currently operational. Estimated water use is about 16,377 gal/day.
- Where is Polcom Alwernia Datacenter located?
- Polcom Alwernia Datacenter is located in Grojec, Poland.
- Who operates Polcom Alwernia Datacenter?
- Polcom Alwernia Datacenter is operated by Polcom Sp. z o.o..
- How big is Polcom Alwernia Datacenter?
- Polcom Alwernia Datacenter has an IT power capacity of 1.435 MW. This figure is estimated.
- Is Polcom Alwernia Datacenter operational?
- Yes — Polcom Alwernia Datacenter is currently operational.
- How much water does Polcom Alwernia Datacenter use?
- Polcom Alwernia Datacenter has an estimated water use of about 16,377 gallons per day.