Active
8.073MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
92Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
45.9dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
ScalewayOperator
About this facility
OPCORE DC3 is a 8.073 MW (est.) data center in France operated by Scaleway, currently operational. Estimated water use is about 92,131 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 8.073 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 92,131 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- OpenStreetMap · retrieved 2026-07-02
- Wikidata · retrieved 2026-07-19
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is OPCORE DC3?
- OPCORE DC3 is a 8.073 MW (est.) data center in France operated by Scaleway, currently operational. Estimated water use is about 92,131 gal/day.
- Where is OPCORE DC3 located?
- OPCORE DC3 is located in France.
- Who operates OPCORE DC3?
- OPCORE DC3 is operated by Scaleway.
- How big is OPCORE DC3?
- OPCORE DC3 has an IT power capacity of 8.073 MW. This figure is estimated.
- Is OPCORE DC3 operational?
- Yes — OPCORE DC3 is currently operational.
- How much water does OPCORE DC3 use?
- OPCORE DC3 has an estimated water use of about 92,131 gallons per day.