Active
55MWIT Capacity
628Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
54.2dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
NTT Global Data CentersOperator
About this facility
NTT LON1 London is a 55 MW data center in Slough, NY, United Kingdom operated by NTT Global Data Centers, currently operational. Estimated water use is about 627,673 gal/day.
NTT's primary London area data center in Slough, one of Europe's largest data center clusters.
Last updated: August 14, 2026
- IT Power Capacity
- 55 MW· peeringdb
- Water Usage
- 627,673 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- London & South East
Sources
- PeeringDB · retrieved 2026-07-01
- AI Estimate · retrieved 2026-08-14
Frequently asked questions
- What is NTT LON1 London?
- NTT LON1 London is a 55 MW data center in Slough, NY, United Kingdom operated by NTT Global Data Centers, currently operational. Estimated water use is about 627,673 gal/day.
- Where is NTT LON1 London located?
- NTT LON1 London is located in Slough, NY, United Kingdom.
- Who operates NTT LON1 London?
- NTT LON1 London is operated by NTT Global Data Centers.
- How big is NTT LON1 London?
- NTT LON1 London has an IT power capacity of 55 MW.
- Is NTT LON1 London operational?
- Yes — NTT LON1 London is currently operational.
- How much water does NTT LON1 London use?
- NTT LON1 London has an estimated water use of about 627,673 gallons per day.