NTT Frankfurt 2 Data Center (FRA2)
Frankfurt, Hessen, Germany
Operated by NTT DATA's Global Data Centers division
1.897MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
22Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
39.6dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
NTT DATA's Global Data Centers divisionOperator
About this facility
NTT Frankfurt 2 Data Center (FRA2) is a 1.897 MW (est.) data center in Frankfurt, Hessen, Germany operated by NTT DATA's Global Data Centers division, currently operational. Estimated water use is about 21,649 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 1.897 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 21,649 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is NTT Frankfurt 2 Data Center (FRA2)?
- NTT Frankfurt 2 Data Center (FRA2) is a 1.897 MW (est.) data center in Frankfurt, Hessen, Germany operated by NTT DATA's Global Data Centers division, currently operational. Estimated water use is about 21,649 gal/day.
- Where is NTT Frankfurt 2 Data Center (FRA2) located?
- NTT Frankfurt 2 Data Center (FRA2) is located in Frankfurt, Hessen, Germany.
- Who operates NTT Frankfurt 2 Data Center (FRA2)?
- NTT Frankfurt 2 Data Center (FRA2) is operated by NTT DATA's Global Data Centers division.
- How big is NTT Frankfurt 2 Data Center (FRA2)?
- NTT Frankfurt 2 Data Center (FRA2) has an IT power capacity of 1.897 MW. This figure is estimated.
- Is NTT Frankfurt 2 Data Center (FRA2) operational?
- Yes — NTT Frankfurt 2 Data Center (FRA2) is currently operational.
- How much water does NTT Frankfurt 2 Data Center (FRA2) use?
- NTT Frankfurt 2 Data Center (FRA2) has an estimated water use of about 21,649 gallons per day.