0.936MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
11Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
36.5dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
NextremumOperator
About this facility
Nextremum NSK-1 is a 0.936 MW (est.) data center in Novosibirsk, Novosibirskiy district, Russia operated by Nextremum, currently operational. Estimated water use is about 10,682 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 0.936 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 10,682 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Nextremum NSK-1?
- Nextremum NSK-1 is a 0.936 MW (est.) data center in Novosibirsk, Novosibirskiy district, Russia operated by Nextremum, currently operational. Estimated water use is about 10,682 gal/day.
- Where is Nextremum NSK-1 located?
- Nextremum NSK-1 is located in Novosibirsk, Novosibirskiy district, Russia.
- Who operates Nextremum NSK-1?
- Nextremum NSK-1 is operated by Nextremum.
- How big is Nextremum NSK-1?
- Nextremum NSK-1 has an IT power capacity of 0.936 MW. This figure is estimated.
- Is Nextremum NSK-1 operational?
- Yes — Nextremum NSK-1 is currently operational.
- How much water does Nextremum NSK-1 use?
- Nextremum NSK-1 has an estimated water use of about 10,682 gallons per day.