NEXTDC logo

NEXTDC S3

Artarmon, NSW, Australia

Operated by NEXTDC

Active
6.039MWAI est.IT Capacity
69Kgal/dayAI est.Water
44.6dB(A)AI est.Est. Noise
NEXTDCOperator

About this facility

NEXTDC S3 is a 6.039 MW (est.) data center in Artarmon, NSW, Australia operated by NEXTDC, currently operational. Estimated water use is about 68,918 gal/day.

Last updated: July 24, 2026

IT Power Capacity
6.039 MWAI est.
Water Usage
68,918 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is NEXTDC S3?
NEXTDC S3 is a 6.039 MW (est.) data center in Artarmon, NSW, Australia operated by NEXTDC, currently operational. Estimated water use is about 68,918 gal/day.
Where is NEXTDC S3 located?
NEXTDC S3 is located in Artarmon, NSW, Australia.
Who operates NEXTDC S3?
NEXTDC S3 is operated by NEXTDC.
How big is NEXTDC S3?
NEXTDC S3 has an IT power capacity of 6.039 MW. This figure is estimated.
Is NEXTDC S3 operational?
Yes — NEXTDC S3 is currently operational.
How much water does NEXTDC S3 use?
NEXTDC S3 has an estimated water use of about 68,918 gallons per day.

Data for NEXTDC S3 sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore