NEXTDC logo

NEXTDC S1

Sydney, NSW, Australia

Operated by NEXTDC

Active
3.814MWAI est.IT Capacity
44Kgal/dayAI est.Water
42.6dB(A)AI est.Est. Noise
NEXTDCOperator

About this facility

NEXTDC S1 is a 3.814 MW (est.) data center in Sydney, NSW, Australia operated by NEXTDC, currently operational. Estimated water use is about 43,526 gal/day.

Last updated: July 24, 2026

IT Power Capacity
3.814 MWAI est.
Water Usage
43,526 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is NEXTDC S1?
NEXTDC S1 is a 3.814 MW (est.) data center in Sydney, NSW, Australia operated by NEXTDC, currently operational. Estimated water use is about 43,526 gal/day.
Where is NEXTDC S1 located?
NEXTDC S1 is located in Sydney, NSW, Australia.
Who operates NEXTDC S1?
NEXTDC S1 is operated by NEXTDC.
How big is NEXTDC S1?
NEXTDC S1 has an IT power capacity of 3.814 MW. This figure is estimated.
Is NEXTDC S1 operational?
Yes — NEXTDC S1 is currently operational.
How much water does NEXTDC S1 use?
NEXTDC S1 has an estimated water use of about 43,526 gallons per day.

Data for NEXTDC S1 sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore