
3.416MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
39Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
42.1dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
NEXTDCOperator
About this facility
NEXTDC P2 is a 3.416 MW (est.) data center in Perth, WAS, Australia operated by NEXTDC, currently operational. Estimated water use is about 38,984 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 3.416 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 38,984 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is NEXTDC P2?
- NEXTDC P2 is a 3.416 MW (est.) data center in Perth, WAS, Australia operated by NEXTDC, currently operational. Estimated water use is about 38,984 gal/day.
- Where is NEXTDC P2 located?
- NEXTDC P2 is located in Perth, WAS, Australia.
- Who operates NEXTDC P2?
- NEXTDC P2 is operated by NEXTDC.
- How big is NEXTDC P2?
- NEXTDC P2 has an IT power capacity of 3.416 MW. This figure is estimated.
- Is NEXTDC P2 operational?
- Yes — NEXTDC P2 is currently operational.
- How much water does NEXTDC P2 use?
- NEXTDC P2 has an estimated water use of about 38,984 gallons per day.