3.181MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
36Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
41.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
NEXTDCOperator
About this facility
NEXTDC C1 is a 3.181 MW (est.) data center in Bruce, ACT, Australia operated by NEXTDC, currently operational. Estimated water use is about 36,302 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 3.181 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 36,302 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is NEXTDC C1?
- NEXTDC C1 is a 3.181 MW (est.) data center in Bruce, ACT, Australia operated by NEXTDC, currently operational. Estimated water use is about 36,302 gal/day.
- Where is NEXTDC C1 located?
- NEXTDC C1 is located in Bruce, ACT, Australia.
- Who operates NEXTDC C1?
- NEXTDC C1 is operated by NEXTDC.
- How big is NEXTDC C1?
- NEXTDC C1 has an IT power capacity of 3.181 MW. This figure is estimated.
- Is NEXTDC C1 operational?
- Yes — NEXTDC C1 is currently operational.
- How much water does NEXTDC C1 use?
- NEXTDC C1 has an estimated water use of about 36,302 gallons per day.