
1.253MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
14Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
37.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
NEXTDCOperator
About this facility
NEXTDC A1 is a 1.253 MW (est.) data center in Adelaide, SAU, Australia operated by NEXTDC, currently operational. Estimated water use is about 14,300 gal/day.
Last updated: July 25, 2026
- IT Power Capacity
- 1.253 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 14,300 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-25
Frequently asked questions
- What is NEXTDC A1?
- NEXTDC A1 is a 1.253 MW (est.) data center in Adelaide, SAU, Australia operated by NEXTDC, currently operational. Estimated water use is about 14,300 gal/day.
- Where is NEXTDC A1 located?
- NEXTDC A1 is located in Adelaide, SAU, Australia.
- Who operates NEXTDC A1?
- NEXTDC A1 is operated by NEXTDC.
- How big is NEXTDC A1?
- NEXTDC A1 has an IT power capacity of 1.253 MW. This figure is estimated.
- Is NEXTDC A1 operational?
- Yes — NEXTDC A1 is currently operational.
- How much water does NEXTDC A1 use?
- NEXTDC A1 has an estimated water use of about 14,300 gallons per day.