0.908MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
10Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
36.4dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
NewTelco GmbHOperator
About this facility
NewTelco Frankfurt is a 0.908 MW (est.) data center in Frankfurt, Germany operated by NewTelco GmbH, currently operational. Estimated water use is about 10,362 gal/day.
Last updated: July 25, 2026
- IT Power Capacity
- 0.908 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 10,362 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-25
Frequently asked questions
- What is NewTelco Frankfurt?
- NewTelco Frankfurt is a 0.908 MW (est.) data center in Frankfurt, Germany operated by NewTelco GmbH, currently operational. Estimated water use is about 10,362 gal/day.
- Where is NewTelco Frankfurt located?
- NewTelco Frankfurt is located in Frankfurt, Germany.
- Who operates NewTelco Frankfurt?
- NewTelco Frankfurt is operated by NewTelco GmbH.
- How big is NewTelco Frankfurt?
- NewTelco Frankfurt has an IT power capacity of 0.908 MW. This figure is estimated.
- Is NewTelco Frankfurt operational?
- Yes — NewTelco Frankfurt is currently operational.
- How much water does NewTelco Frankfurt use?
- NewTelco Frankfurt has an estimated water use of about 10,362 gallons per day.