Meridien Renewable Energy Hub and Data Centre
Western Australia, Australia
1000MWIT Capacity
11.4Mgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
66.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Meridien Renewable Energy Hub and Data Centre is a 1000 MW data center in Western Australia, Australia, currently planned. Estimated water use is about 11,412,230 gal/day.
Planned data center Meridien Renewable Energy Hub and Data Centre by Gingerah Energy in Shire of Broome County, Western Australia, AU.
Last updated: November 5, 2026
- IT Power Capacity
- 1000 MW· research_agent
- Water Usage
- 11,412,230 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- datacenterdynamics.com · retrieved 2026-11-04
- environment.gov.au · retrieved 2026-11-04
- energy-storage.news · retrieved 2026-11-04
- environment.gov.au · retrieved 2026-11-04
- AI Estimate · retrieved 2026-11-05
Frequently asked questions
- What is Meridien Renewable Energy Hub and Data Centre?
- Meridien Renewable Energy Hub and Data Centre is a 1000 MW data center in Western Australia, Australia, currently planned. Estimated water use is about 11,412,230 gal/day.
- Where is Meridien Renewable Energy Hub and Data Centre located?
- Meridien Renewable Energy Hub and Data Centre is located in Western Australia, Australia.
- How big is Meridien Renewable Energy Hub and Data Centre?
- Meridien Renewable Energy Hub and Data Centre has an IT power capacity of 1000 MW.
- Is Meridien Renewable Energy Hub and Data Centre operational?
- Meridien Renewable Energy Hub and Data Centre is currently planned. Milestone dates are sourced from public planning records as they become available.
- How much water does Meridien Renewable Energy Hub and Data Centre use?
- Meridien Renewable Energy Hub and Data Centre has an estimated water use of about 11,412,230 gallons per day.