LightEdge Solutions logo

LightEdge Des Moines 2 (DSM2)

Altoona, IA, United States

Operated by LightEdge Solutions

Active
4.25MWAI est.IT Capacity
49Kgal/dayAI est.Water
43.1dB(A)AI est.Est. Noise
LightEdge SolutionsOperator

About this facility

LightEdge Des Moines 2 (DSM2) is a 4.25 MW (est.) data center in Altoona, IA, United States operated by LightEdge Solutions, currently operational. Estimated water use is about 48,502 gal/day.

Last updated: July 25, 2026

IT Power Capacity
4.25 MWAI est.
Water Usage
48,502 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is LightEdge Des Moines 2 (DSM2)?
LightEdge Des Moines 2 (DSM2) is a 4.25 MW (est.) data center in Altoona, IA, United States operated by LightEdge Solutions, currently operational. Estimated water use is about 48,502 gal/day.
Where is LightEdge Des Moines 2 (DSM2) located?
LightEdge Des Moines 2 (DSM2) is located in Altoona, IA, United States.
Who operates LightEdge Des Moines 2 (DSM2)?
LightEdge Des Moines 2 (DSM2) is operated by LightEdge Solutions.
How big is LightEdge Des Moines 2 (DSM2)?
LightEdge Des Moines 2 (DSM2) has an IT power capacity of 4.25 MW. This figure is estimated.
Is LightEdge Des Moines 2 (DSM2) operational?
Yes — LightEdge Des Moines 2 (DSM2) is currently operational.
How much water does LightEdge Des Moines 2 (DSM2) use?
LightEdge Des Moines 2 (DSM2) has an estimated water use of about 48,502 gallons per day.

Data for LightEdge Des Moines 2 (DSM2) sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore