
2.324MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
27Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
40.5dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
LightEdge SolutionsOperator
About this facility
LightEdge Austin 1 (AUS1) is a 2.324 MW (est.) data center in Austin, TX, United States operated by LightEdge Solutions, currently operational. Estimated water use is about 26,522 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 2.324 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 26,522 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is LightEdge Austin 1 (AUS1)?
- LightEdge Austin 1 (AUS1) is a 2.324 MW (est.) data center in Austin, TX, United States operated by LightEdge Solutions, currently operational. Estimated water use is about 26,522 gal/day.
- Where is LightEdge Austin 1 (AUS1) located?
- LightEdge Austin 1 (AUS1) is located in Austin, TX, United States.
- Who operates LightEdge Austin 1 (AUS1)?
- LightEdge Austin 1 (AUS1) is operated by LightEdge Solutions.
- How big is LightEdge Austin 1 (AUS1)?
- LightEdge Austin 1 (AUS1) has an IT power capacity of 2.324 MW. This figure is estimated.
- Is LightEdge Austin 1 (AUS1) operational?
- Yes — LightEdge Austin 1 (AUS1) is currently operational.
- How much water does LightEdge Austin 1 (AUS1) use?
- LightEdge Austin 1 (AUS1) has an estimated water use of about 26,522 gallons per day.