
3.159MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
36Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
41.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Lumen Technologies IncOperator
About this facility
Level(3) McLean is a 3.159 MW (est.) data center in McLean, VA, United States operated by Lumen Technologies Inc, currently operational. Estimated water use is about 36,051 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 3.159 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 36,051 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Level(3) McLean?
- Level(3) McLean is a 3.159 MW (est.) data center in McLean, VA, United States operated by Lumen Technologies Inc, currently operational. Estimated water use is about 36,051 gal/day.
- Where is Level(3) McLean located?
- Level(3) McLean is located in McLean, VA, United States.
- Who operates Level(3) McLean?
- Level(3) McLean is operated by Lumen Technologies Inc.
- How big is Level(3) McLean?
- Level(3) McLean has an IT power capacity of 3.159 MW. This figure is estimated.
- Is Level(3) McLean operational?
- Yes — Level(3) McLean is currently operational.
- How much water does Level(3) McLean use?
- Level(3) McLean has an estimated water use of about 36,051 gallons per day.