1.733MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
20Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
39.2dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Lumen Technologies IncOperator
About this facility
Level(3) Atlanta (Courtland) is a 1.733 MW (est.) data center in Atlanta, GA, United States operated by Lumen Technologies Inc, currently operational. Estimated water use is about 19,777 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 1.733 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 19,777 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Level(3) Atlanta (Courtland)?
- Level(3) Atlanta (Courtland) is a 1.733 MW (est.) data center in Atlanta, GA, United States operated by Lumen Technologies Inc, currently operational. Estimated water use is about 19,777 gal/day.
- Where is Level(3) Atlanta (Courtland) located?
- Level(3) Atlanta (Courtland) is located in Atlanta, GA, United States.
- Who operates Level(3) Atlanta (Courtland)?
- Level(3) Atlanta (Courtland) is operated by Lumen Technologies Inc.
- How big is Level(3) Atlanta (Courtland)?
- Level(3) Atlanta (Courtland) has an IT power capacity of 1.733 MW. This figure is estimated.
- Is Level(3) Atlanta (Courtland) operational?
- Yes — Level(3) Atlanta (Courtland) is currently operational.
- How much water does Level(3) Atlanta (Courtland) use?
- Level(3) Atlanta (Courtland) has an estimated water use of about 19,777 gallons per day.