0.386MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
4Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
32.7dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Leading Edge Data CentresOperator
About this facility
LEDC - TMW1 - Tamworth is a 0.386 MW (est.) data center in Tamworth, NSW, Australia operated by Leading Edge Data Centres, currently operational. Estimated water use is about 4,405 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 0.386 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 4,405 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is LEDC - TMW1 - Tamworth?
- LEDC - TMW1 - Tamworth is a 0.386 MW (est.) data center in Tamworth, NSW, Australia operated by Leading Edge Data Centres, currently operational. Estimated water use is about 4,405 gal/day.
- Where is LEDC - TMW1 - Tamworth located?
- LEDC - TMW1 - Tamworth is located in Tamworth, NSW, Australia.
- Who operates LEDC - TMW1 - Tamworth?
- LEDC - TMW1 - Tamworth is operated by Leading Edge Data Centres.
- How big is LEDC - TMW1 - Tamworth?
- LEDC - TMW1 - Tamworth has an IT power capacity of 0.386 MW. This figure is estimated.
- Is LEDC - TMW1 - Tamworth operational?
- Yes — LEDC - TMW1 - Tamworth is currently operational.
- How much water does LEDC - TMW1 - Tamworth use?
- LEDC - TMW1 - Tamworth has an estimated water use of about 4,405 gallons per day.