Leading Edge Data Centres logo

LEDC - NTL1 - Newcastle

Mayfield West, NSW, Australia

Operated by Leading Edge Data Centres

Active
0.337MWAI est.IT Capacity
4Kgal/dayAI est.Water
32.1dB(A)AI est.Est. Noise
Leading Edge Data CentresOperator

About this facility

LEDC - NTL1 - Newcastle is a 0.337 MW (est.) data center in Mayfield West, NSW, Australia operated by Leading Edge Data Centres, currently operational. Estimated water use is about 3,846 gal/day.

Last updated: July 24, 2026

IT Power Capacity
0.337 MWAI est.
Water Usage
3,846 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is LEDC - NTL1 - Newcastle?
LEDC - NTL1 - Newcastle is a 0.337 MW (est.) data center in Mayfield West, NSW, Australia operated by Leading Edge Data Centres, currently operational. Estimated water use is about 3,846 gal/day.
Where is LEDC - NTL1 - Newcastle located?
LEDC - NTL1 - Newcastle is located in Mayfield West, NSW, Australia.
Who operates LEDC - NTL1 - Newcastle?
LEDC - NTL1 - Newcastle is operated by Leading Edge Data Centres.
How big is LEDC - NTL1 - Newcastle?
LEDC - NTL1 - Newcastle has an IT power capacity of 0.337 MW. This figure is estimated.
Is LEDC - NTL1 - Newcastle operational?
Yes — LEDC - NTL1 - Newcastle is currently operational.
How much water does LEDC - NTL1 - Newcastle use?
LEDC - NTL1 - Newcastle has an estimated water use of about 3,846 gallons per day.

Data for LEDC - NTL1 - Newcastle sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore