LCL Belgium logo

LCL Wallonia One

Gembloux, Belgium

Operated by LCL Belgium

Active
5.079MWAI est.IT Capacity
58Kgal/dayAI est.Water
43.9dB(A)AI est.Est. Noise
LCL BelgiumOperator

About this facility

LCL Wallonia One is a 5.079 MW (est.) data center in Gembloux, Belgium operated by LCL Belgium, currently operational. Estimated water use is about 57,963 gal/day.

Last updated: July 24, 2026

IT Power Capacity
5.079 MWAI est.
Water Usage
57,963 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is LCL Wallonia One?
LCL Wallonia One is a 5.079 MW (est.) data center in Gembloux, Belgium operated by LCL Belgium, currently operational. Estimated water use is about 57,963 gal/day.
Where is LCL Wallonia One located?
LCL Wallonia One is located in Gembloux, Belgium.
Who operates LCL Wallonia One?
LCL Wallonia One is operated by LCL Belgium.
How big is LCL Wallonia One?
LCL Wallonia One has an IT power capacity of 5.079 MW. This figure is estimated.
Is LCL Wallonia One operational?
Yes — LCL Wallonia One is currently operational.
How much water does LCL Wallonia One use?
LCL Wallonia One has an estimated water use of about 57,963 gallons per day.

Data for LCL Wallonia One sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore