
5.079MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
58Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
43.9dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
LCL BelgiumOperator
About this facility
LCL Wallonia One is a 5.079 MW (est.) data center in Gembloux, Belgium operated by LCL Belgium, currently operational. Estimated water use is about 57,963 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 5.079 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 57,963 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is LCL Wallonia One?
- LCL Wallonia One is a 5.079 MW (est.) data center in Gembloux, Belgium operated by LCL Belgium, currently operational. Estimated water use is about 57,963 gal/day.
- Where is LCL Wallonia One located?
- LCL Wallonia One is located in Gembloux, Belgium.
- Who operates LCL Wallonia One?
- LCL Wallonia One is operated by LCL Belgium.
- How big is LCL Wallonia One?
- LCL Wallonia One has an IT power capacity of 5.079 MW. This figure is estimated.
- Is LCL Wallonia One operational?
- Yes — LCL Wallonia One is currently operational.
- How much water does LCL Wallonia One use?
- LCL Wallonia One has an estimated water use of about 57,963 gallons per day.