
2.521MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
29Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
40.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
LCL BelgiumOperator
About this facility
LCL Brussels West is a 2.521 MW (est.) data center in Aalst, Flanders, Belgium operated by LCL Belgium, currently operational. Estimated water use is about 28,770 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 2.521 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 28,770 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is LCL Brussels West?
- LCL Brussels West is a 2.521 MW (est.) data center in Aalst, Flanders, Belgium operated by LCL Belgium, currently operational. Estimated water use is about 28,770 gal/day.
- Where is LCL Brussels West located?
- LCL Brussels West is located in Aalst, Flanders, Belgium.
- Who operates LCL Brussels West?
- LCL Brussels West is operated by LCL Belgium.
- How big is LCL Brussels West?
- LCL Brussels West has an IT power capacity of 2.521 MW. This figure is estimated.
- Is LCL Brussels West operational?
- Yes — LCL Brussels West is currently operational.
- How much water does LCL Brussels West use?
- LCL Brussels West has an estimated water use of about 28,770 gallons per day.