
1.644MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
19Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
39dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
kt cloud Co., LtdOperator
About this facility
kt cloud Namguro is a 1.644 MW (est.) data center in Guro-gu, Seoul, South Korea operated by kt cloud Co., Ltd, currently operational. Estimated water use is about 18,762 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 1.644 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 18,762 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is kt cloud Namguro?
- kt cloud Namguro is a 1.644 MW (est.) data center in Guro-gu, Seoul, South Korea operated by kt cloud Co., Ltd, currently operational. Estimated water use is about 18,762 gal/day.
- Where is kt cloud Namguro located?
- kt cloud Namguro is located in Guro-gu, Seoul, South Korea.
- Who operates kt cloud Namguro?
- kt cloud Namguro is operated by kt cloud Co., Ltd.
- How big is kt cloud Namguro?
- kt cloud Namguro has an IT power capacity of 1.644 MW. This figure is estimated.
- Is kt cloud Namguro operational?
- Yes — kt cloud Namguro is currently operational.
- How much water does kt cloud Namguro use?
- kt cloud Namguro has an estimated water use of about 18,762 gallons per day.