
1.249MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
14Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
37.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
KIOOperator
About this facility
KIO Monterrey 1 (MTY1) is a 1.249 MW (est.) data center in Monterrey, Nuevo Leon, Mexico operated by KIO, currently operational. Estimated water use is about 14,254 gal/day.
KIO Networks, Av. Manuel Gómez Morín 350, Valle del Campestre, 66266 Monterrey, N.L. Coordenadas: 25.649222,-100.3607381,17z https://g.page/kio-networks-monterrey?share
Last updated: July 24, 2026
- IT Power Capacity
- 1.249 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 14,254 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is KIO Monterrey 1 (MTY1)?
- KIO Monterrey 1 (MTY1) is a 1.249 MW (est.) data center in Monterrey, Nuevo Leon, Mexico operated by KIO, currently operational. Estimated water use is about 14,254 gal/day.
- Where is KIO Monterrey 1 (MTY1) located?
- KIO Monterrey 1 (MTY1) is located in Monterrey, Nuevo Leon, Mexico.
- Who operates KIO Monterrey 1 (MTY1)?
- KIO Monterrey 1 (MTY1) is operated by KIO.
- How big is KIO Monterrey 1 (MTY1)?
- KIO Monterrey 1 (MTY1) has an IT power capacity of 1.249 MW. This figure is estimated.
- Is KIO Monterrey 1 (MTY1) operational?
- Yes — KIO Monterrey 1 (MTY1) is currently operational.
- How much water does KIO Monterrey 1 (MTY1) use?
- KIO Monterrey 1 (MTY1) has an estimated water use of about 14,254 gallons per day.