
1.081MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
12Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
37.1dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
KIOOperator
About this facility
KIO Mérida 2 (MER2) is a 1.081 MW (est.) data center in Mérida, Yucatán, Mexico operated by KIO, currently operational. Estimated water use is about 12,337 gal/day.
Calle 19 452 Col. Ciudad Industrial CP. 97288 Mérida Yucatán Coordenadas 20,929436,-89,681856 22°55'45.97"N 89°40'54.68"W
Last updated: July 24, 2026
- IT Power Capacity
- 1.081 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 12,337 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is KIO Mérida 2 (MER2)?
- KIO Mérida 2 (MER2) is a 1.081 MW (est.) data center in Mérida, Yucatán, Mexico operated by KIO, currently operational. Estimated water use is about 12,337 gal/day.
- Where is KIO Mérida 2 (MER2) located?
- KIO Mérida 2 (MER2) is located in Mérida, Yucatán, Mexico.
- Who operates KIO Mérida 2 (MER2)?
- KIO Mérida 2 (MER2) is operated by KIO.
- How big is KIO Mérida 2 (MER2)?
- KIO Mérida 2 (MER2) has an IT power capacity of 1.081 MW. This figure is estimated.
- Is KIO Mérida 2 (MER2) operational?
- Yes — KIO Mérida 2 (MER2) is currently operational.
- How much water does KIO Mérida 2 (MER2) use?
- KIO Mérida 2 (MER2) has an estimated water use of about 12,337 gallons per day.