
1.996MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
23Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
39.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
KIOOperator
About this facility
KIO Hermosillo 1 (HER1) is a 1.996 MW (est.) data center in Hermosillo, Sonora, Mexico operated by KIO, currently operational. Estimated water use is about 22,779 gal/day.
Calle Gral. Bernardo Reyes 104 Col. San Benito CP. 83190 Hermosillo Sonora Coordenadas: 29.085539,-110.961058 29°5'7.94"N 110°57"39.81"W
Last updated: July 24, 2026
- IT Power Capacity
- 1.996 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 22,779 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is KIO Hermosillo 1 (HER1)?
- KIO Hermosillo 1 (HER1) is a 1.996 MW (est.) data center in Hermosillo, Sonora, Mexico operated by KIO, currently operational. Estimated water use is about 22,779 gal/day.
- Where is KIO Hermosillo 1 (HER1) located?
- KIO Hermosillo 1 (HER1) is located in Hermosillo, Sonora, Mexico.
- Who operates KIO Hermosillo 1 (HER1)?
- KIO Hermosillo 1 (HER1) is operated by KIO.
- How big is KIO Hermosillo 1 (HER1)?
- KIO Hermosillo 1 (HER1) has an IT power capacity of 1.996 MW. This figure is estimated.
- Is KIO Hermosillo 1 (HER1) operational?
- Yes — KIO Hermosillo 1 (HER1) is currently operational.
- How much water does KIO Hermosillo 1 (HER1) use?
- KIO Hermosillo 1 (HER1) has an estimated water use of about 22,779 gallons per day.