
2.106MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
24Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
40dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
InteractiveOperator
About this facility
Interactive Melbourne is a 2.106 MW (est.) data center in Port Melbourne, VIC, Australia operated by Interactive, currently operational. Estimated water use is about 24,034 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 2.106 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 24,034 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Interactive Melbourne?
- Interactive Melbourne is a 2.106 MW (est.) data center in Port Melbourne, VIC, Australia operated by Interactive, currently operational. Estimated water use is about 24,034 gal/day.
- Where is Interactive Melbourne located?
- Interactive Melbourne is located in Port Melbourne, VIC, Australia.
- Who operates Interactive Melbourne?
- Interactive Melbourne is operated by Interactive.
- How big is Interactive Melbourne?
- Interactive Melbourne has an IT power capacity of 2.106 MW. This figure is estimated.
- Is Interactive Melbourne operational?
- Yes — Interactive Melbourne is currently operational.
- How much water does Interactive Melbourne use?
- Interactive Melbourne has an estimated water use of about 24,034 gallons per day.