Hurricane Electric Fremont 2
15.6MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
178Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
48.7dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Hurricane Electric Fremont 2 is a 15.6 MW (est.) data center in , currently operational. Estimated water use is about 178,031 gal/day.
Last updated: July 25, 2026
- IT Power Capacity
- 15.6 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 178,031 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- Wikidata · retrieved 2026-07-19
- AI Estimate · retrieved 2026-07-25
Frequently asked questions
- What is Hurricane Electric Fremont 2?
- Hurricane Electric Fremont 2 is a 15.6 MW (est.) data center in , currently operational. Estimated water use is about 178,031 gal/day.
- How big is Hurricane Electric Fremont 2?
- Hurricane Electric Fremont 2 has an IT power capacity of 15.6 MW. This figure is estimated.
- Is Hurricane Electric Fremont 2 operational?
- Yes — Hurricane Electric Fremont 2 is currently operational.
- How much water does Hurricane Electric Fremont 2 use?
- Hurricane Electric Fremont 2 has an estimated water use of about 178,031 gallons per day.