Hurricane Electric logo

Hurricane Electric Fremont 1

Fremont, CA, United States

Operated by Hurricane Electric

Active
2.527MWAI est.IT Capacity
29Kgal/dayAI est.Water
40.8dB(A)AI est.Est. Noise
Hurricane ElectricOperator

About this facility

Hurricane Electric Fremont 1 is a 2.527 MW (est.) data center in Fremont, CA, United States operated by Hurricane Electric, currently operational. Estimated water use is about 28,839 gal/day.

Last updated: July 25, 2026

IT Power Capacity
2.527 MWAI est.
Water Usage
28,839 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is Hurricane Electric Fremont 1?
Hurricane Electric Fremont 1 is a 2.527 MW (est.) data center in Fremont, CA, United States operated by Hurricane Electric, currently operational. Estimated water use is about 28,839 gal/day.
Where is Hurricane Electric Fremont 1 located?
Hurricane Electric Fremont 1 is located in Fremont, CA, United States.
Who operates Hurricane Electric Fremont 1?
Hurricane Electric Fremont 1 is operated by Hurricane Electric.
How big is Hurricane Electric Fremont 1?
Hurricane Electric Fremont 1 has an IT power capacity of 2.527 MW. This figure is estimated.
Is Hurricane Electric Fremont 1 operational?
Yes — Hurricane Electric Fremont 1 is currently operational.
How much water does Hurricane Electric Fremont 1 use?
Hurricane Electric Fremont 1 has an estimated water use of about 28,839 gallons per day.

Data for Hurricane Electric Fremont 1 sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore