DataZone BVBA logo

Hasselt DC2

Hasselt, Belgium

Operated by DataZone BVBA

Active
4.103MWAI est.IT Capacity
47Kgal/dayAI est.Water
42.9dB(A)AI est.Est. Noise
DataZone BVBAOperator

About this facility

Hasselt DC2 is a 4.103 MW (est.) data center in Hasselt, Belgium operated by DataZone BVBA, currently operational. Estimated water use is about 46,824 gal/day.

Last updated: July 24, 2026

IT Power Capacity
4.103 MWAI est.
Water Usage
46,824 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is Hasselt DC2?
Hasselt DC2 is a 4.103 MW (est.) data center in Hasselt, Belgium operated by DataZone BVBA, currently operational. Estimated water use is about 46,824 gal/day.
Where is Hasselt DC2 located?
Hasselt DC2 is located in Hasselt, Belgium.
Who operates Hasselt DC2?
Hasselt DC2 is operated by DataZone BVBA.
How big is Hasselt DC2?
Hasselt DC2 has an IT power capacity of 4.103 MW. This figure is estimated.
Is Hasselt DC2 operational?
Yes — Hasselt DC2 is currently operational.
How much water does Hasselt DC2 use?
Hasselt DC2 has an estimated water use of about 46,824 gallons per day.

Data for Hasselt DC2 sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore