10.385MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
119Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
47dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
H5 Data CentersOperator
About this facility
H5 Data Centers Quincy 2/3 is a 10.385 MW (est.) data center in Quincy, WA, United States operated by H5 Data Centers, currently operational. Estimated water use is about 118,516 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 10.385 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 118,516 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is H5 Data Centers Quincy 2/3?
- H5 Data Centers Quincy 2/3 is a 10.385 MW (est.) data center in Quincy, WA, United States operated by H5 Data Centers, currently operational. Estimated water use is about 118,516 gal/day.
- Where is H5 Data Centers Quincy 2/3 located?
- H5 Data Centers Quincy 2/3 is located in Quincy, WA, United States.
- Who operates H5 Data Centers Quincy 2/3?
- H5 Data Centers Quincy 2/3 is operated by H5 Data Centers.
- How big is H5 Data Centers Quincy 2/3?
- H5 Data Centers Quincy 2/3 has an IT power capacity of 10.385 MW. This figure is estimated.
- Is H5 Data Centers Quincy 2/3 operational?
- Yes — H5 Data Centers Quincy 2/3 is currently operational.
- How much water does H5 Data Centers Quincy 2/3 use?
- H5 Data Centers Quincy 2/3 has an estimated water use of about 118,516 gallons per day.