
3.83MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
44Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
42.6dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
H5 Data CentersOperator
About this facility
H5 Data Centers Phoenix is a 3.83 MW (est.) data center in Chandler, AZ, United States operated by H5 Data Centers, currently operational. Estimated water use is about 43,709 gal/day.
Carrier List: http://h5datacenters.com/carrier-list.html
Last updated: July 24, 2026
- IT Power Capacity
- 3.83 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 43,709 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is H5 Data Centers Phoenix?
- H5 Data Centers Phoenix is a 3.83 MW (est.) data center in Chandler, AZ, United States operated by H5 Data Centers, currently operational. Estimated water use is about 43,709 gal/day.
- Where is H5 Data Centers Phoenix located?
- H5 Data Centers Phoenix is located in Chandler, AZ, United States.
- Who operates H5 Data Centers Phoenix?
- H5 Data Centers Phoenix is operated by H5 Data Centers.
- How big is H5 Data Centers Phoenix?
- H5 Data Centers Phoenix has an IT power capacity of 3.83 MW. This figure is estimated.
- Is H5 Data Centers Phoenix operational?
- Yes — H5 Data Centers Phoenix is currently operational.
- How much water does H5 Data Centers Phoenix use?
- H5 Data Centers Phoenix has an estimated water use of about 43,709 gallons per day.