0.537MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
6Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
34.1dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EXA InfrastructureOperator
About this facility
EXA Edge DC Bordeaux is a 0.537 MW (est.) data center in Bordeaux, France operated by EXA Infrastructure, currently operational. Estimated water use is about 6,128 gal/day.
fka Interoute Bordeaux
Last updated: July 24, 2026
- IT Power Capacity
- 0.537 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 6,128 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is EXA Edge DC Bordeaux?
- EXA Edge DC Bordeaux is a 0.537 MW (est.) data center in Bordeaux, France operated by EXA Infrastructure, currently operational. Estimated water use is about 6,128 gal/day.
- Where is EXA Edge DC Bordeaux located?
- EXA Edge DC Bordeaux is located in Bordeaux, France.
- Who operates EXA Edge DC Bordeaux?
- EXA Edge DC Bordeaux is operated by EXA Infrastructure.
- How big is EXA Edge DC Bordeaux?
- EXA Edge DC Bordeaux has an IT power capacity of 0.537 MW. This figure is estimated.
- Is EXA Edge DC Bordeaux operational?
- Yes — EXA Edge DC Bordeaux is currently operational.
- How much water does EXA Edge DC Bordeaux use?
- EXA Edge DC Bordeaux has an estimated water use of about 6,128 gallons per day.