EVOLINK EAD logo

Evolink Data Center Sofia 2

Sofia, Bulgaria

Operated by EVOLINK EAD

Active
0.336MWAI est.IT Capacity
4Kgal/dayAI est.Water
32.1dB(A)AI est.Est. Noise
EVOLINK EADOperator

About this facility

Evolink Data Center Sofia 2 is a 0.336 MW (est.) data center in Sofia, Bulgaria operated by EVOLINK EAD, currently operational. Estimated water use is about 3,835 gal/day.

Last updated: July 24, 2026

IT Power Capacity
0.336 MWAI est.
Water Usage
3,835 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is Evolink Data Center Sofia 2?
Evolink Data Center Sofia 2 is a 0.336 MW (est.) data center in Sofia, Bulgaria operated by EVOLINK EAD, currently operational. Estimated water use is about 3,835 gal/day.
Where is Evolink Data Center Sofia 2 located?
Evolink Data Center Sofia 2 is located in Sofia, Bulgaria.
Who operates Evolink Data Center Sofia 2?
Evolink Data Center Sofia 2 is operated by EVOLINK EAD.
How big is Evolink Data Center Sofia 2?
Evolink Data Center Sofia 2 has an IT power capacity of 0.336 MW. This figure is estimated.
Is Evolink Data Center Sofia 2 operational?
Yes — Evolink Data Center Sofia 2 is currently operational.
How much water does Evolink Data Center Sofia 2 use?
Evolink Data Center Sofia 2 has an estimated water use of about 3,835 gallons per day.

Data for Evolink Data Center Sofia 2 sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore