
0.629MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
7Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
34.8dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Energieversorgung Filstal GmbH & Co. KGOperator
About this facility
EVF Datacenter is a 0.629 MW (est.) data center in Göppingen, Germany operated by Energieversorgung Filstal GmbH & Co. KG, currently operational. Estimated water use is about 7,178 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 0.629 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 7,178 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is EVF Datacenter?
- EVF Datacenter is a 0.629 MW (est.) data center in Göppingen, Germany operated by Energieversorgung Filstal GmbH & Co. KG, currently operational. Estimated water use is about 7,178 gal/day.
- Where is EVF Datacenter located?
- EVF Datacenter is located in Göppingen, Germany.
- Who operates EVF Datacenter?
- EVF Datacenter is operated by Energieversorgung Filstal GmbH & Co. KG.
- How big is EVF Datacenter?
- EVF Datacenter has an IT power capacity of 0.629 MW. This figure is estimated.
- Is EVF Datacenter operational?
- Yes — EVF Datacenter is currently operational.
- How much water does EVF Datacenter use?
- EVF Datacenter has an estimated water use of about 7,178 gallons per day.