0.373MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
4Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
32.5dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
euNetworks GroupOperator
About this facility
euNetworks Colocation Dortmund is a 0.373 MW (est.) data center in Dortmund, Germany operated by euNetworks Group, currently operational. Estimated water use is about 4,257 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 0.373 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 4,257 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is euNetworks Colocation Dortmund?
- euNetworks Colocation Dortmund is a 0.373 MW (est.) data center in Dortmund, Germany operated by euNetworks Group, currently operational. Estimated water use is about 4,257 gal/day.
- Where is euNetworks Colocation Dortmund located?
- euNetworks Colocation Dortmund is located in Dortmund, Germany.
- Who operates euNetworks Colocation Dortmund?
- euNetworks Colocation Dortmund is operated by euNetworks Group.
- How big is euNetworks Colocation Dortmund?
- euNetworks Colocation Dortmund has an IT power capacity of 0.373 MW. This figure is estimated.
- Is euNetworks Colocation Dortmund operational?
- Yes — euNetworks Colocation Dortmund is currently operational.
- How much water does euNetworks Colocation Dortmund use?
- euNetworks Colocation Dortmund has an estimated water use of about 4,257 gallons per day.