0.325MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
4Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
31.9dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
Etix EverywhereOperator
About this facility
ETIX Montpellier #1 is a 0.325 MW (est.) data center in Montpellier, Montpellier, France operated by Etix Everywhere, currently operational. Estimated water use is about 3,709 gal/day.
This facility has been acquired by ETIX Everywhere as part of an acquisition of zColo France SAS ([press release](https://www.databank.com/resources/press-releases/databank-completes-sale-of-french-data-center-assets-to-etix-everywhere/))
Last updated: July 25, 2026
- IT Power Capacity
- 0.325 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 3,709 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-25
Frequently asked questions
- What is ETIX Montpellier #1?
- ETIX Montpellier #1 is a 0.325 MW (est.) data center in Montpellier, Montpellier, France operated by Etix Everywhere, currently operational. Estimated water use is about 3,709 gal/day.
- Where is ETIX Montpellier #1 located?
- ETIX Montpellier #1 is located in Montpellier, Montpellier, France.
- Who operates ETIX Montpellier #1?
- ETIX Montpellier #1 is operated by Etix Everywhere.
- How big is ETIX Montpellier #1?
- ETIX Montpellier #1 has an IT power capacity of 0.325 MW. This figure is estimated.
- Is ETIX Montpellier #1 operational?
- Yes — ETIX Montpellier #1 is currently operational.
- How much water does ETIX Montpellier #1 use?
- ETIX Montpellier #1 has an estimated water use of about 3,709 gallons per day.