4.45MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
51Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
43.3dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
eStruxture Data Centers Inc.Operator
About this facility
eStruxture TOR-5 is a 4.45 MW (est.) data center in Barrie, ON, Canada operated by eStruxture Data Centers Inc., currently operational. Estimated water use is about 50,784 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 4.45 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 50,784 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is eStruxture TOR-5?
- eStruxture TOR-5 is a 4.45 MW (est.) data center in Barrie, ON, Canada operated by eStruxture Data Centers Inc., currently operational. Estimated water use is about 50,784 gal/day.
- Where is eStruxture TOR-5 located?
- eStruxture TOR-5 is located in Barrie, ON, Canada.
- Who operates eStruxture TOR-5?
- eStruxture TOR-5 is operated by eStruxture Data Centers Inc..
- How big is eStruxture TOR-5?
- eStruxture TOR-5 has an IT power capacity of 4.45 MW. This figure is estimated.
- Is eStruxture TOR-5 operational?
- Yes — eStruxture TOR-5 is currently operational.
- How much water does eStruxture TOR-5 use?
- eStruxture TOR-5 has an estimated water use of about 50,784 gallons per day.