
1.907MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
22Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
39.6dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix ZW1 - Zwolle is a 1.907 MW (est.) data center in Zwolle, Netherlands operated by Equinix, currently operational. Estimated water use is about 21,763 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 1.907 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 21,763 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix ZW1 - Zwolle?
- Equinix ZW1 - Zwolle is a 1.907 MW (est.) data center in Zwolle, Netherlands operated by Equinix, currently operational. Estimated water use is about 21,763 gal/day.
- Where is Equinix ZW1 - Zwolle located?
- Equinix ZW1 - Zwolle is located in Zwolle, Netherlands.
- Who operates Equinix ZW1 - Zwolle?
- Equinix ZW1 - Zwolle is operated by Equinix.
- How big is Equinix ZW1 - Zwolle?
- Equinix ZW1 - Zwolle has an IT power capacity of 1.907 MW. This figure is estimated.
- Is Equinix ZW1 - Zwolle operational?
- Yes — Equinix ZW1 - Zwolle is currently operational.
- How much water does Equinix ZW1 - Zwolle use?
- Equinix ZW1 - Zwolle has an estimated water use of about 21,763 gallons per day.