3.59MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
41Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
42.4dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix ZH5 - Zurich, South is a 3.59 MW (est.) data center in Zurich, ZH, Switzerland operated by Equinix, currently operational. Estimated water use is about 40,970 gal/day.
This facility is part of an Equinix Campus with diverse, sub-10km [Campus Cross Connects] (https://www.equinix.com/resources/data-sheets/cross-connects/) available to the following IBX's: [Zurich ZH2] (https://www.peeringdb.com/fac/83) [Zurich ZH4] (https://www.peeringdb.com/fac/833)
Last updated: July 24, 2026
- IT Power Capacity
- 3.59 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 40,970 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix ZH5 - Zurich, South?
- Equinix ZH5 - Zurich, South is a 3.59 MW (est.) data center in Zurich, ZH, Switzerland operated by Equinix, currently operational. Estimated water use is about 40,970 gal/day.
- Where is Equinix ZH5 - Zurich, South located?
- Equinix ZH5 - Zurich, South is located in Zurich, ZH, Switzerland.
- Who operates Equinix ZH5 - Zurich, South?
- Equinix ZH5 - Zurich, South is operated by Equinix.
- How big is Equinix ZH5 - Zurich, South?
- Equinix ZH5 - Zurich, South has an IT power capacity of 3.59 MW. This figure is estimated.
- Is Equinix ZH5 - Zurich, South operational?
- Yes — Equinix ZH5 - Zurich, South is currently operational.
- How much water does Equinix ZH5 - Zurich, South use?
- Equinix ZH5 - Zurich, South has an estimated water use of about 40,970 gallons per day.