Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3)

Brampton, ON, Canada

Operated by Equinix

Active
17.959MWAI est.IT Capacity
205Kgal/dayAI est.Water
49.3dB(A)AI est.Est. Noise
EquinixOperator

About this facility

Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3) is a 17.959 MW (est.) data center in Brampton, ON, Canada operated by Equinix, currently operational. Estimated water use is about 204,952 gal/day.

Formerly Q9 Brampton 1/2/3

Last updated: July 25, 2026

IT Power Capacity
17.959 MWAI est.
Water Usage
204,952 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3)?
Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3) is a 17.959 MW (est.) data center in Brampton, ON, Canada operated by Equinix, currently operational. Estimated water use is about 204,952 gal/day.
Where is Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3) located?
Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3) is located in Brampton, ON, Canada.
Who operates Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3)?
Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3) is operated by Equinix.
How big is Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3)?
Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3) has an IT power capacity of 17.959 MW. This figure is estimated.
Is Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3) operational?
Yes — Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3) is currently operational.
How much water does Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3) use?
Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3) has an estimated water use of about 204,952 gallons per day.

Data for Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3) sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.