
3.274MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
37Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
42dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix TR2 - Toronto is a 3.274 MW (est.) data center in Toronto, ON, Canada operated by Equinix, currently operational. Estimated water use is about 37,364 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 3.274 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 37,364 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix TR2 - Toronto?
- Equinix TR2 - Toronto is a 3.274 MW (est.) data center in Toronto, ON, Canada operated by Equinix, currently operational. Estimated water use is about 37,364 gal/day.
- Where is Equinix TR2 - Toronto located?
- Equinix TR2 - Toronto is located in Toronto, ON, Canada.
- Who operates Equinix TR2 - Toronto?
- Equinix TR2 - Toronto is operated by Equinix.
- How big is Equinix TR2 - Toronto?
- Equinix TR2 - Toronto has an IT power capacity of 3.274 MW. This figure is estimated.
- Is Equinix TR2 - Toronto operational?
- Yes — Equinix TR2 - Toronto is currently operational.
- How much water does Equinix TR2 - Toronto use?
- Equinix TR2 - Toronto has an estimated water use of about 37,364 gallons per day.