0.876MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
10Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
36.2dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix SY7 - Sydney (formerly Metronode Illawara 1) is a 0.876 MW (est.) data center in Unanderra, NSW, Australia operated by Equinix, currently operational. Estimated water use is about 9,997 gal/day.
Last updated: July 25, 2026
- IT Power Capacity
- 0.876 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 9,997 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-25
Frequently asked questions
- What is Equinix SY7 - Sydney (formerly Metronode Illawara 1)?
- Equinix SY7 - Sydney (formerly Metronode Illawara 1) is a 0.876 MW (est.) data center in Unanderra, NSW, Australia operated by Equinix, currently operational. Estimated water use is about 9,997 gal/day.
- Where is Equinix SY7 - Sydney (formerly Metronode Illawara 1) located?
- Equinix SY7 - Sydney (formerly Metronode Illawara 1) is located in Unanderra, NSW, Australia.
- Who operates Equinix SY7 - Sydney (formerly Metronode Illawara 1)?
- Equinix SY7 - Sydney (formerly Metronode Illawara 1) is operated by Equinix.
- How big is Equinix SY7 - Sydney (formerly Metronode Illawara 1)?
- Equinix SY7 - Sydney (formerly Metronode Illawara 1) has an IT power capacity of 0.876 MW. This figure is estimated.
- Is Equinix SY7 - Sydney (formerly Metronode Illawara 1) operational?
- Yes — Equinix SY7 - Sydney (formerly Metronode Illawara 1) is currently operational.
- How much water does Equinix SY7 - Sydney (formerly Metronode Illawara 1) use?
- Equinix SY7 - Sydney (formerly Metronode Illawara 1) has an estimated water use of about 9,997 gallons per day.