Equinix SV5
13.148MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
150Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
48dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
About this facility
Equinix SV5 is a 13.148 MW (est.) data center in , currently operational. Estimated water use is about 150,048 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 13.148 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 150,048 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- Wikidata · retrieved 2026-07-19
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix SV5?
- Equinix SV5 is a 13.148 MW (est.) data center in , currently operational. Estimated water use is about 150,048 gal/day.
- How big is Equinix SV5?
- Equinix SV5 has an IT power capacity of 13.148 MW. This figure is estimated.
- Is Equinix SV5 operational?
- Yes — Equinix SV5 is currently operational.
- How much water does Equinix SV5 use?
- Equinix SV5 has an estimated water use of about 150,048 gallons per day.