0.983MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
11Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
36.7dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix SE2/SE3 - Seattle is a 0.983 MW (est.) data center in Seattle, WA, United States operated by Equinix, currently operational. Estimated water use is about 11,218 gal/day.
Westin Building
Last updated: July 24, 2026
- IT Power Capacity
- 0.983 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 11,218 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix SE2/SE3 - Seattle?
- Equinix SE2/SE3 - Seattle is a 0.983 MW (est.) data center in Seattle, WA, United States operated by Equinix, currently operational. Estimated water use is about 11,218 gal/day.
- Where is Equinix SE2/SE3 - Seattle located?
- Equinix SE2/SE3 - Seattle is located in Seattle, WA, United States.
- Who operates Equinix SE2/SE3 - Seattle?
- Equinix SE2/SE3 - Seattle is operated by Equinix.
- How big is Equinix SE2/SE3 - Seattle?
- Equinix SE2/SE3 - Seattle has an IT power capacity of 0.983 MW. This figure is estimated.
- Is Equinix SE2/SE3 - Seattle operational?
- Yes — Equinix SE2/SE3 - Seattle is currently operational.
- How much water does Equinix SE2/SE3 - Seattle use?
- Equinix SE2/SE3 - Seattle has an estimated water use of about 11,218 gallons per day.