
3.828MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
44Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
42.6dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix OT1 - Ottawa is a 3.828 MW (est.) data center in Gatineau, QC, Canada operated by Equinix, currently operational. Estimated water use is about 43,686 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 3.828 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 43,686 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix OT1 - Ottawa?
- Equinix OT1 - Ottawa is a 3.828 MW (est.) data center in Gatineau, QC, Canada operated by Equinix, currently operational. Estimated water use is about 43,686 gal/day.
- Where is Equinix OT1 - Ottawa located?
- Equinix OT1 - Ottawa is located in Gatineau, QC, Canada.
- Who operates Equinix OT1 - Ottawa?
- Equinix OT1 - Ottawa is operated by Equinix.
- How big is Equinix OT1 - Ottawa?
- Equinix OT1 - Ottawa has an IT power capacity of 3.828 MW. This figure is estimated.
- Is Equinix OT1 - Ottawa operational?
- Yes — Equinix OT1 - Ottawa is currently operational.
- How much water does Equinix OT1 - Ottawa use?
- Equinix OT1 - Ottawa has an estimated water use of about 43,686 gallons per day.