Equinix logo

Equinix OT1 - Ottawa

Gatineau, QC, Canada

Operated by Equinix

Active
3.828MWAI est.IT Capacity
44Kgal/dayAI est.Water
42.6dB(A)AI est.Est. Noise
EquinixOperator

About this facility

Equinix OT1 - Ottawa is a 3.828 MW (est.) data center in Gatineau, QC, Canada operated by Equinix, currently operational. Estimated water use is about 43,686 gal/day.

Last updated: July 24, 2026

IT Power Capacity
3.828 MWAI est.
Water Usage
43,686 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is Equinix OT1 - Ottawa?
Equinix OT1 - Ottawa is a 3.828 MW (est.) data center in Gatineau, QC, Canada operated by Equinix, currently operational. Estimated water use is about 43,686 gal/day.
Where is Equinix OT1 - Ottawa located?
Equinix OT1 - Ottawa is located in Gatineau, QC, Canada.
Who operates Equinix OT1 - Ottawa?
Equinix OT1 - Ottawa is operated by Equinix.
How big is Equinix OT1 - Ottawa?
Equinix OT1 - Ottawa has an IT power capacity of 3.828 MW. This figure is estimated.
Is Equinix OT1 - Ottawa operational?
Yes — Equinix OT1 - Ottawa is currently operational.
How much water does Equinix OT1 - Ottawa use?
Equinix OT1 - Ottawa has an estimated water use of about 43,686 gallons per day.

Data for Equinix OT1 - Ottawa sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore