
21.21MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
242Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
50.1dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix MX1/MX2 - Mexico City is a 21.21 MW (est.) data center in El Marques, Querétaro, Mexico operated by Equinix, currently operational. Estimated water use is about 242,053 gal/day.
Last updated: July 25, 2026
- IT Power Capacity
- 21.21 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 242,053 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-25
Frequently asked questions
- What is Equinix MX1/MX2 - Mexico City?
- Equinix MX1/MX2 - Mexico City is a 21.21 MW (est.) data center in El Marques, Querétaro, Mexico operated by Equinix, currently operational. Estimated water use is about 242,053 gal/day.
- Where is Equinix MX1/MX2 - Mexico City located?
- Equinix MX1/MX2 - Mexico City is located in El Marques, Querétaro, Mexico.
- Who operates Equinix MX1/MX2 - Mexico City?
- Equinix MX1/MX2 - Mexico City is operated by Equinix.
- How big is Equinix MX1/MX2 - Mexico City?
- Equinix MX1/MX2 - Mexico City has an IT power capacity of 21.21 MW. This figure is estimated.
- Is Equinix MX1/MX2 - Mexico City operational?
- Yes — Equinix MX1/MX2 - Mexico City is currently operational.
- How much water does Equinix MX1/MX2 - Mexico City use?
- Equinix MX1/MX2 - Mexico City has an estimated water use of about 242,053 gallons per day.