17.573MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
201Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
49.2dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix MO2 - Monterrey is a 17.573 MW (est.) data center in Apodaca, Nuevo León, Mexico operated by Equinix, currently operational. Estimated water use is about 200,547 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 17.573 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 200,547 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix MO2 - Monterrey?
- Equinix MO2 - Monterrey is a 17.573 MW (est.) data center in Apodaca, Nuevo León, Mexico operated by Equinix, currently operational. Estimated water use is about 200,547 gal/day.
- Where is Equinix MO2 - Monterrey located?
- Equinix MO2 - Monterrey is located in Apodaca, Nuevo León, Mexico.
- Who operates Equinix MO2 - Monterrey?
- Equinix MO2 - Monterrey is operated by Equinix.
- How big is Equinix MO2 - Monterrey?
- Equinix MO2 - Monterrey has an IT power capacity of 17.573 MW. This figure is estimated.
- Is Equinix MO2 - Monterrey operational?
- Yes — Equinix MO2 - Monterrey is currently operational.
- How much water does Equinix MO2 - Monterrey use?
- Equinix MO2 - Monterrey has an estimated water use of about 200,547 gallons per day.