
3.317MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
38Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
42dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix ML5 - Milan is a 3.317 MW (est.) data center in 5 Settimo Milanese, Milan, Italy operated by Equinix, currently operational. Estimated water use is about 37,854 gal/day.
Last updated: July 24, 2026
- IT Power Capacity
- 3.317 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 37,854 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix ML5 - Milan?
- Equinix ML5 - Milan is a 3.317 MW (est.) data center in 5 Settimo Milanese, Milan, Italy operated by Equinix, currently operational. Estimated water use is about 37,854 gal/day.
- Where is Equinix ML5 - Milan located?
- Equinix ML5 - Milan is located in 5 Settimo Milanese, Milan, Italy.
- Who operates Equinix ML5 - Milan?
- Equinix ML5 - Milan is operated by Equinix.
- How big is Equinix ML5 - Milan?
- Equinix ML5 - Milan has an IT power capacity of 3.317 MW. This figure is estimated.
- Is Equinix ML5 - Milan operational?
- Yes — Equinix ML5 - Milan is currently operational.
- How much water does Equinix ML5 - Milan use?
- Equinix ML5 - Milan has an estimated water use of about 37,854 gallons per day.