Equinix logo

Equinix ME5 - Melbourne (formerly Metronode Melbourne 1)

Melbourne, VIC, Australia

Operated by Equinix

Active
1.217MWAI est.IT Capacity
14Kgal/dayAI est.Water
37.7dB(A)AI est.Est. Noise
EquinixOperator

About this facility

Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) is a 1.217 MW (est.) data center in Melbourne, VIC, Australia operated by Equinix, currently operational. Estimated water use is about 13,889 gal/day.

Additional connectivity within the metro using [Fibre Connect] (https://www.equinix.com/resources/data-sheets/fiber-connect) is available to the following IBX's: [Melbourne ME1/2](https://www.peeringdb.com/fac/1988) Was: Nextgen Melbourne 1

Last updated: July 25, 2026

IT Power Capacity
1.217 MWAI est.
Water Usage
13,889 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is Equinix ME5 - Melbourne (formerly Metronode Melbourne 1)?
Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) is a 1.217 MW (est.) data center in Melbourne, VIC, Australia operated by Equinix, currently operational. Estimated water use is about 13,889 gal/day.
Where is Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) located?
Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) is located in Melbourne, VIC, Australia.
Who operates Equinix ME5 - Melbourne (formerly Metronode Melbourne 1)?
Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) is operated by Equinix.
How big is Equinix ME5 - Melbourne (formerly Metronode Melbourne 1)?
Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) has an IT power capacity of 1.217 MW. This figure is estimated.
Is Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) operational?
Yes — Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) is currently operational.
How much water does Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) use?
Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) has an estimated water use of about 13,889 gallons per day.

Data for Equinix ME5 - Melbourne (formerly Metronode Melbourne 1) sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.

← Back to explore