Equinix ME1/ME2 - Melbourne

Melbourne, VIC, Australia

Operated by Equinix

Active
3.144MWAI est.IT Capacity
36Kgal/dayAI est.Water
41.8dB(A)AI est.Est. Noise
EquinixOperator

About this facility

Equinix ME1/ME2 - Melbourne is a 3.144 MW (est.) data center in Melbourne, VIC, Australia operated by Equinix, currently operational. Estimated water use is about 35,880 gal/day.

This facility is part of an Equinix Campus with diverse, sub-10km [Campus Cross Connects] (https://www.equinix.com/resources/data-sheets/cross-connects/) available to the following IBX's: Melbourne ME1/2 Additional connectivity within the metro using [Fibre Connect] (https://www.equinix.com/resources/data-sheets/fiber-connect) is available to the following IBX's: [Melbourne ME5] (https://www.peeringdb.com/fac/691) ME1 = Unit A, ME2 = Unit B

Last updated: July 24, 2026

IT Power Capacity
3.144 MWAI est.
Water Usage
35,880 gal/dayAI est.
Zoning
Not available
Distance to Residential
Not available
County / District
Not available
Region
Not available

Sources

Frequently asked questions

What is Equinix ME1/ME2 - Melbourne?
Equinix ME1/ME2 - Melbourne is a 3.144 MW (est.) data center in Melbourne, VIC, Australia operated by Equinix, currently operational. Estimated water use is about 35,880 gal/day.
Where is Equinix ME1/ME2 - Melbourne located?
Equinix ME1/ME2 - Melbourne is located in Melbourne, VIC, Australia.
Who operates Equinix ME1/ME2 - Melbourne?
Equinix ME1/ME2 - Melbourne is operated by Equinix.
How big is Equinix ME1/ME2 - Melbourne?
Equinix ME1/ME2 - Melbourne has an IT power capacity of 3.144 MW. This figure is estimated.
Is Equinix ME1/ME2 - Melbourne operational?
Yes — Equinix ME1/ME2 - Melbourne is currently operational.
How much water does Equinix ME1/ME2 - Melbourne use?
Equinix ME1/ME2 - Melbourne has an estimated water use of about 35,880 gallons per day.

Data for Equinix ME1/ME2 - Melbourne sourced from PeeringDB, OpenStreetMap, AI Estimate. Values marked est. are estimates.