1.321MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.IT Capacity
15Kgal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Water
38dB(A)AI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.Est. Noise
EquinixOperator
About this facility
Equinix LS1 - Lisbon is a 1.321 MW (est.) data center in Lisbon, Portugal operated by Equinix, currently operational. Estimated water use is about 15,076 gal/day.
This facility is part of the [Equinix Lisbon Campus] (https://www.peeringdb.com/campus/195) with diverse, sub-10km [Campus Cross Connects] (https://www.equinix.com/resources/data-sheets/cross-connects/) available to the following IBX's: [Lisbon LS2] (https://www.peeringdb.com/fac/16863)
Last updated: July 24, 2026
- IT Power Capacity
- 1.321 MWAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Water Usage
- 15,076 gal/dayAI est.AI EstimateModeled from leading published research on data center power, water use, and acoustics — including industry efficiency surveys, water-usage-effectiveness studies, and operator sustainability disclosures — calibrated to this facility's verified attributes. Replaced by actual figures as they're published.
- Zoning
- Not available
- Distance to Residential
- Not available
- County / District
- Not available
- Region
- Not available
Sources
- PeeringDB · retrieved 2026-07-01
- OpenStreetMap · retrieved 2026-07-02
- AI Estimate · retrieved 2026-07-24
Frequently asked questions
- What is Equinix LS1 - Lisbon?
- Equinix LS1 - Lisbon is a 1.321 MW (est.) data center in Lisbon, Portugal operated by Equinix, currently operational. Estimated water use is about 15,076 gal/day.
- Where is Equinix LS1 - Lisbon located?
- Equinix LS1 - Lisbon is located in Lisbon, Portugal.
- Who operates Equinix LS1 - Lisbon?
- Equinix LS1 - Lisbon is operated by Equinix.
- How big is Equinix LS1 - Lisbon?
- Equinix LS1 - Lisbon has an IT power capacity of 1.321 MW. This figure is estimated.
- Is Equinix LS1 - Lisbon operational?
- Yes — Equinix LS1 - Lisbon is currently operational.
- How much water does Equinix LS1 - Lisbon use?
- Equinix LS1 - Lisbon has an estimated water use of about 15,076 gallons per day.